Incorrect dates and times...
I have noticed that the file dates and times on files I add to the project are showing incorrectly. They haven't always been like this.
5
·
complete
1
mobile install task item locations not showing
when clicking the location drop down only "all" and "unassigned" are available.
2
·
complete
1
Save to PDF dialog no longer allows you to manually rename file upon saving
This sucks really REALLY bad. We used to be able to type in our own report names when saving to a PDF from the report viewer and with the 'Add to Project Files' option selected. Now we ONLY have formatting fields?!? And not even a complete list of fields? This is a HUGE step backwards. This is TERRIBLE. We need this feature back ASAP or D-Tools needs to URGENTLY add additional fields to select from to the file name format including: Today's Date with formatting options like mm/dd/yy or yyyy-mm-dd, etc. Current Project Rev#, Current CO #, Current CO Rev# (which you DON'T have) There is currently no other way to manage change order PDF revisions EXCEPT filenames. Fix ASAP! This is unacceptable.
2
·
complete
1
Typo / Spelling Error
A picture is worth a thousand words.
2
·
complete
1
Project Status Color not populating on certain Business Analytics
I do see project status colors on BAs that are project related, but the analytics that are based on change orders do not show the colors despite 'Project Status' being a column than can be added to the layout. I also note that the column for project status is labeled differently between these BAs despite appearing to being the same data.
2
·
complete
1
Gantt Chart Predecessors don't update when rows are added
I noticed when I went through and set all predecessors on my gantt that some tasks were missing and I needed to add several tasks throughout the gantt. What I found however is that when a task is added in the middle of the chart, the predecessors that are below the new task do not update/increment to account for the new task so adding a task in the middle of the chart invalidated all predecessors below it. Huge bug.
3
·
complete
1
Gantt Chart Row#s doubling
IDK if I am missing something, but when I am setting predecessors, I am seeing double row numbers when choosing the task predecessor. In this example, while I have highlighted row 4, you can see all the options to select a predecessor are doubled.
2
·
complete
1
Managing User Group 'Save' resets group selection
When modifying permissions for User Groups, when you click 'Save', it deselects the user group you were currently modifying and resets the selection to the first group. So if you save mid-way through your permissions audit, you may inadvertantly modify permission of a different group if you aren't paying attention.
2
·
complete
2
Component ID not populating correctly in V22.24.4964.0
When Location2Abbreviation is selected in Component ID Format, the newest DTools version (updated today) now won't show the "Room" abbreviation in the component ID. Also, the "Create Support Ticket" function does not work properly. It does not proved a Captcha to use and won't submit the ticket without it.
2
·
complete
1
Project Item Editor - Incorrect Tax Rate Shown for CO Items
When an item is added to a change order, and that change order is assigned to a different tax rate than the approved project, the tax rate shown next to the "taxable" checkbox in item editor displays the approved project's tax rate, not the tax rate of the change order to which that item is assigned.
3
·